OEM Metal Casting Parts , Precision CNC Machined Parts For Aerospace Engineering
Place of Origin | Guangdong,China |
---|---|
Brand Name | OEM/ODM |
Minimum Order Quantity | 100pcs |
Price | Confirm price based on product |
Packaging Details | Bubble Bags, Corrugated Carton,Pallet or as per customer`s requirement on Casting Parts |
Delivery Time | Tooling: 4~12 weeks update part size; Samples: one week if no finish and CNC machining required; Production:2~3weeks |
Payment Terms | Advance 30% deposit and ship after receiving 70% final payment |
Supply Ability | 500 tons of aluminum alloy material |
Contact me for free samples and coupons.
Whatsapp:0086 18588475571
Wechat: 0086 18588475571
Skype: sales10@aixton.com
If you have any concern, we provide 24-hour online help.
xWeight | Customized | OEM/ODM | Available |
---|---|---|---|
Dimensions | Drawing Requirements Or Sample | Standard | ASTM, DIN, JIS, Etc. |
Material | Metal | Size | Customized |
Shape | Customized | Tolerance | ±0.001mm |
High Light | Aerospace Metal Casting Parts,Engineering Metal Casting Parts,OEM Precision CNC Machined Parts |
OEM/ODM Available Precision CNC Machined Metal Casting Products
Product Description:
Metal Casting Parts are highly demanded by many industries for their strength, durability, and customized size requirements. Our metal casting factory is one of the leading suppliers in the market that provide top-notch metal casting supplies with Wooden Cases, Cartons, etc. for packaging. We are also committed to providing you with the best OEM/ODM services available and meeting any drawing requirements or sample size. Our products are highly accurate and reliable, with a tolerance of ±0.001mm. Our metal casting factory is dedicated to delivering superior quality products to meet your exact needs.
Features:
- Metal Foundry Parts: Metal Casting Parts
- Weight: Customized
- Dimensions: Drawing Requirements Or Sample
- Shape: Customized
- Packaging: Wooden Case, Carton, Etc.
- Quality Control: Professional Testing Tools
- Metal Casting Articles: Metal Casting Parts
- Metal Casting Products: Metal Casting Parts
Technical Parameters:
Item | Details |
---|---|
Machining | Precision CNC Machining |
Service | OEM Service |
Material | Metal |
Size | Customized |
Standard | ASTM, DIN, JIS, Etc. |
Shape | Customized |
Tolerance | ±0.001mm |
Quality Control | Professional Testing Tools |
Drawing Format | PDF, IGS, STP, Etc. |
Weight | Customized |
Applications:
Metal Casting Parts are widely used in various industries, such as automobile, aerospace, mechanical engineering, medical equipment, agriculture, etc. They are manufactured with superior brand name OEM/ODM and lasting quality control, using aluminum alloy material with a maximum weight of 500 tons, and precision tolerance of ±0.001mm with ASTM, DIN, JIS, Etc. standard.
The minimum order quantity for custom casting parts is 100pcs, and the price is confirmed based on the product. The delivery time is Tooling: 4~12 weeks for updating part size; Samples: one week if no finish and CNC machining required; Production:2~3weeks. The payment terms are Advance 30% deposit and ship after receiving 70% final payment. Packaging is Bubble Bags, Corrugated Carton,Pallet or as per customer's requirement.
Metal Casting Parts are provided by OEM Service and quality is ensured by Professional Testing Tools. It is an ideal choice for those who need high-quality and reliable Metal Casting Supplies.
Customization:
Our metal casting parts service is perfect for OEM/ODM orders and can be customized to meet your specific needs. Our product is made of aluminum alloy material and comes from Guangdong, China. The minimum order quantity is 100 pieces and prices confirm upon product selection. We package our parts in bubble bags, corrugated cartons, pallets, or as per customer's requirement. Our tooling process takes 4-12 weeks, while samples are delivered within one week, and production within 2-3 weeks. Payment terms require a 30% advance deposit and 70% balance upon delivery. We have a supply ability of 500 tons and accept various drawing formats including PDF, IGS, and STP. Our metal casting parts are machined with precision CNC machining and exact dimensions as per drawing requirements or sample. Quality control is implemented with professional testing tools, and our process includes casting. We specialize in metal casting supplies, metal casting articles, metal foundry parts, and metal casting parts.
Support and Services:
- Assistance in designing, manufacturing and assembly of Metal Casting Parts.
- Provide technical advice on the selection of materials, processes and design considerations for Metal Casting Parts.
- Offer on-site technical support for installation, assembly and maintenance of Metal Casting Parts.
- Provide after-sales service for Metal Casting Parts.
- Periodical maintenance and inspection services for Metal Casting Parts.
- Provide training for Metal Casting Parts.
- Offer quality assurance and quality control services for Metal Casting Parts.
Packing and Shipping:
Metal Casting Parts are packaged in boxes or crates, depending on the size and weight of the parts. For smaller parts, individual boxes are used. For larger parts, crates are used for extra protection. All packaging is designed to protect the parts from any damage while in transit.
Shipping is done via ground transport, air freight and sea freight. Ground transport is usually used for smaller parts and air freight is used for larger and heavier parts. Sea freight is used for bulk orders. All shipments are tracked for quality assurance and customer satisfaction.
FAQ:
- Q: What is the brand name of the Casting Parts?
- A: OEM/ODM.
- Q: Where is the Casting Parts manufactured?
- A: The Casting Parts is manufactured in Guangdong, China.
- Q: What is the minimum order quantity?
- A: The minimum order quantity is 100pcs.
- Q: What is the payment terms?
- A: The payment terms is advance 30% deposit and ship after receiving 70% final payment.
- Q: How about the delivery time?
- A: The delivery time for tooling is 4~12 weeks, for samples is one week if no finish and CNC machining required, production is 2~3 weeks.